Power standard
120/240V, 60Hz
Confirm service, connectors and generator rating from the actual equipment list.
Prepare a builder-ready equipment and utility brief while accounting for the 2026 Texas permit transition, Austin fire review, private-site conditions and right-of-way permissions.
120/240V, 60Hz
Confirm service, connectors and generator rating from the actual equipment list.
Texas DSHS took over mobile-vendor permitting from local health departments on July 1, 2026.
Propane or grease-producing equipment can trigger Austin Fire requirements.
Private property, events and public right-of-way have separate location requirements.
Austin Public Health says mobile food vendors operating in Austin and Travis County must hold the Texas DSHS Mobile Food Vending Permit beginning July 1, 2026. Review the current transition guidance before applying.
Austin Fire handles its own application and inspection process for units using propane or appliances that produce grease-laden vapors. Design the equipment, LPG and hood systems together.
Confirm zoning, owner permission, parking, restroom arrangements and limits that apply to the proposed site. Avoid purchasing a trailer around an unverified location assumption.
A health permit does not itself grant permission to vend from streets or sidewalks. Event and right-of-way applications can require separate documentation and location review.
Record appliance model, fuel, dimensions, clearances and cooking process so ventilation and fire protection match the menu.
Include refrigeration, AC, exhaust, water heating and pumps when estimating continuous electrical demand and generator capacity.
Size fresh water, hot water and wastewater around sinks, menu, staffing and service duration—not trailer size alone.
Confirm delivery access, parking, customer circulation, shore power, generator exhaust, waste collection and restroom arrangements.
Austin Public Health states that Texas DSHS administers the state Mobile Food Vending Permit beginning July 1, 2026. Use the current city and state guidance because transition details may evolve.
Austin Fire states that its process applies to units with propane or appliances, including electric appliances, that produce grease-laden vapors. Confirm the current requirement for the proposed equipment and location.
No. Health, fire, zoning, private-property, event and public-right-of-way permissions are separate.