Prepare the electrical brief
- List every cooking, refrigeration, HVAC, pump and lighting load.
- Record voltage, phase, running watts and manufacturer startup data.
- Separate generator loads from shore-power-only equipment.
- Ask the fabricator how the generator compartment is ventilated and isolated.