Project budget tool
Food truck and mobile kitchen build cost calculator
Turn supplier estimates into a realistic project range. Compare low, expected and high costs, add contingency and taxes, measure the funding gap and copy a structured budget brief for builders or lenders.
Build the budgetNo invented market prices: enter quotations or researched estimates for your location and specification. The calculator organizes your figures; it does not promise a build price, loan approval or commercial return.
Step 1
Set the project assumptions
% of pre-tax project costs
Enter only the non-recoverable rate
Cash plus confirmed finance
| Budget category | Low estimate | Expected estimate | High estimate |
|---|
Builder and lender brief
Preliminary mobile-kitchen project budget
Compare like with like
Ask each builder to separate base vehicle, fabrication, equipment, utility systems, approvals, delivery and taxes. Record exclusions and owner-supplied items beside every quote.
Protect the contingency
Contingency is for unresolved scope and genuine surprises. It should not hide missing known items, underpriced equipment or expected design changes.
Plan cash timing
A fully funded total can still create a cash-flow problem. Confirm deposits, progress payments, equipment orders, retention, commissioning and final handover milestones.
Before accepting a quotation
- Confirm the exact chassis, trailer or vehicle specification and ownership status.
- Reconcile every appliance and utility item against drawings and schedules.
- Identify permits, professional fees, inspections and authority charges.
- Clarify delivery, registration, insurance, warranties and after-sales support.
- Document payment milestones, change-order rules and cancellation terms.
- Check which taxes are included and whether any are recoverable.
- Keep working capital and launch costs separate from the fabrication budget.