Fire-safety cost guide

Food truck fire-suppression cost: compare the scope, not just the total

A credible quote must be based on your actual appliance lineup, hood and duct, shutdown controls, local approval process and installation conditions. This guide helps you request like-for-like prices without inventing a universal figure.

Build my quote scope
Safety first: This is planning information, not a system design. Use a qualified fire-suppression contractor and obtain approval from the authority having jurisdiction before fabrication or appliance changes.
Price drivers

What changes the final quote

Protected cooking hazards

Appliance type, model, dimensions, fuel and position determine the required coverage. Fryers, griddles, ranges, broilers and woks are not interchangeable hazards.

Hood, plenum and duct

Coverage may extend beyond the appliance line. Hood geometry, plenum and duct arrangement must be coordinated with the listed system and installation instructions.

Agent, cylinders and nozzles

The protected hazard and design method affect agent capacity, cylinder count, piping, fittings and nozzle selection. Ask for the proposed design basis.

Detection and manual release

Detection components, control hardware, manual pull stations and routing all add material and installation work—especially inside a compact vehicle.

Fuel and electrical shutdowns

System actuation may need to stop fuel or electrical energy to protected appliances and coordinate alarms or ventilation. Clarify who supplies every interlock.

Approval and lifecycle scope

Drawings, permits, inspection attendance, commissioning, travel, certification records and future inspection or service can be priced separately.

Interactive quote tool

Build a contractor-ready fire-suppression scope

Select what is known today. The tool identifies coordination items and produces a copyable enquiry checklist. It does not calculate a price or design the system.

Project basics
Protected cooking equipment
Shutdowns and controls
Approvals and handover
Quote comparison

Ask every contractor to itemize the same scope

A low headline price may omit the hood, shutdown wiring, permit work or inspection attendance. Use this table when requesting and comparing proposals.

ScopeWhat to provideWhat the quote should state
Equipment scheduleManufacturer, model, fuel, dimensions, heat input and fixed position for every cooking appliance.Which hazards are protected and whether coverage is appliance-specific or overlapping.
Hood and exhaustHood listing, dimensions, plenum, duct route, exhaust and makeup-air design.Whether hood, plenum and duct protection—and the hood hardware itself—are included.
Controls and shutdownsGas, electrical, ventilation and alarm/control drawings where available.Detection, manual release, fuel shutoff, electrical interlocks, alarm outputs and who wires or tests them.
Vehicle installationUnit dimensions, wall/ceiling construction, access, service clearances and build location.Piping route, penetrations, brackets, finishes, travel and any builder work excluded.
ApprovalsOperating jurisdiction and known health, fire, mechanical or vehicle requirements.Drawings, submissions, fees, inspection attendance, commissioning, documentation and correction policy.
Ongoing serviceExpected operating locations and service access.Inspection and maintenance plan, consumables, call-out terms and whether service is available where the unit travels.
Design choice

Appliance-specific coverage

Nozzles are selected and positioned for defined appliances. This can be precise, but changing a model or moving equipment may alter the approved coverage.

Design choice

Overlapping coverage

Some listed designs create overlapping protection zones for greater layout flexibility within defined limits. It still requires a compliant design and contractor review.

Before accepting a quote

Seven items to confirm in writing

  1. The exact appliances and hazards covered.
  2. The proposed listed system and design method.
  3. All hood, duct, piping, nozzle, detection and release inclusions.
  4. Required gas and electrical shutdowns and who completes them.
  5. Drawings, permit fees, inspection attendance and commissioning.
  6. Training, completion records, warranties and future service terms.
  7. How appliance or layout changes will be reviewed and priced.

Read the hood and ventilation guide Plan electrical loads

Official references

Verify the design with authoritative guidance

Brand note: ANSUL is a Johnson Controls brand. A local requirement may be based on a listed system, applicable standard and authority approval rather than one brand name. Verify acceptable systems locally.