Power standard
120/240V, 60Hz
Confirm every appliance rating and simultaneous demand.
Prepare a menu-led equipment and power brief while coordinating Georgia county health permits, a base of operation, Atlanta vending permissions and hot-weather utility loads.
120/240V, 60Hz
Confirm every appliance rating and simultaneous demand.
Georgia links the unit to a permitted base of operation in its originating county.
Health approval does not replace city, property, event or right-of-way permission.
Allow for refrigeration, AC and ventilation during hot, humid operation.
Georgia describes a mobile food service establishment as including the mobile unit and its base of operation. Start with the county health department and confirm the applicable application and review process.
Georgia Department of Public Health food-service resources →
Prepare the commissary or base layout, menu, mobile-unit layout, servicing arrangements and other materials requested by the county of origin before committing to a final build.
Atlanta public vending requires its own city process. The city lists business and health documentation for mobile food trucks and identifies designated public vending arrangements.
The Street Eats program covers designated public-right-of-way locations. Private sites and special events follow different permission pathways, so confirm where the unit will actually operate.
Document preparation, cooking, holding, refrigeration, warewashing and service volume so the layout matches the operation.
Size potable and wastewater systems for the menu, sinks, service duration and base-of-operation routine.
Coordinate grease-producing appliances, hood coverage, exhaust, make-up air, LPG and required fire protection as one system.
Calculate continuous demand and startup loads for refrigeration, AC, pumps and fans before selecting shore power or a generator.
Investigate county health permits and base-of-operation requirements, authorization for other counties, City of Atlanta business and vending requirements, property or event permission, and applicable fire review.
No. Health approval and permission to occupy or vend from a location are separate. Public right-of-way, private property and events can require different permissions.
Equipment commonly uses 120/240V, 60Hz supply, but confirm voltage, phase, current, connectors, generator rating and site power for the final package.