1. Reduce the load first
Choose efficient refrigeration, induction or electric cooking where appropriate, stage heat-up periods and avoid simultaneous peaks that do not support the menu.
Turn a cooking concept into a realistic load profile, battery and inverter brief—without overlooking charging time, payload, heat rejection or operational backup.
Open the battery calculatorChoose efficient refrigeration, induction or electric cooking where appropriate, stage heat-up periods and avoid simultaneous peaks that do not support the menu.
Inverter kW covers simultaneous and surge demand. Battery kWh covers how long the kitchen can run. Both need reserve and conversion-loss allowances.
Confirm depot or commissary supply, connector, available current, dwell time and whether opportunity charging is practical between events.
A correctly designed shore connection can support preparation, recharge batteries and reduce cycle depth. Verify the venue supply before relying on it.
Batteries, enclosures, cooling and power electronics compete with water, stock and equipment for mass and volume. Model axle and GVWR effects early.
Coordinate battery-system listings, isolation, protection, ventilation or cooling, emergency response, service access and fire strategy with qualified specialists.
Venue or commissary supply carries service loads; a smaller battery handles transitions or selected equipment. Best where reliable rated connections are guaranteed.
The battery and inverter carry most service loads. It needs a disciplined load profile, sufficient usable energy and a dependable recharge window.
Battery, shore power and another approved supply source are coordinated. Controls must prevent overload and make the operating mode clear to staff.