Espresso production
State group count, steam demand, peak drinks per hour, grinder count, batch-brew or hot-water needs and the exact proposed models.
A strong coffee-van brief connects menu volume, espresso equipment, power, water, refrigeration, workflow and vehicle limits. Use this guide to compare regional fabricators on the same scope—not just the headline price.
State group count, steam demand, peak drinks per hour, grinder count, batch-brew or hot-water needs and the exact proposed models.
Record voltage, phase, maximum wattage and current for every appliance. Include simultaneous loads, motor startup and planned shore, generator or battery sources.
Plan potable storage, filtration or treatment, pump pressure, drainage, wastewater capacity, cleaning and winterization where relevant.
Allow for milk refrigeration, display storage, ice, ambient conditions, door openings and safe temperature monitoring throughout service.
Map order taking, grinding, extraction, steaming, handwashing, rinsing, pickup and restocking so people and hot liquids do not conflict.
Check payload, axle distribution, ventilation, equipment restraints, access panels, maintenance clearances and local vehicle requirements.
Commercial machine ratings vary significantly by model and configuration. For example, La Marzocco publishes 220–240 V ratings from 2.5 kW for a one-group Linea Classic S, while larger configurations can exceed 5 kW. Use the selected model’s nameplate and installation documents—never the example alone.
Boiler recovery, steaming, refrigeration cycling and other appliances can overlap. A builder or electrician needs both the connected load and the realistic simultaneous-demand plan.
| Topic | Ask the builder | Evidence to request |
|---|---|---|
| Relevant experience | How many coffee or espresso vehicles have you completed with a similar service volume? | Recent builds, client references and photographs showing utilities and service access—not only exterior finishes. |
| Electrical design | Who calculates demand, selects protection and signs off the completed installation? | Load schedule, single-line or distribution documentation, test records and responsible trade details. |
| Water system | How are potable water, treatment, pump, hot water, drainage and wastewater sized and maintained? | Tank capacities, component schedule, access plan, winterization method and cleaning instructions. |
| Approvals | Which drawings, listings, inspections and local approvals are included? | A written approvals responsibility matrix and clear exclusions. |
| Weight and layout | What is the estimated completed weight and axle distribution with full tanks and equipment? | Weight assumptions, payload margin, equipment positions and final weighing provision. |
| Warranty and support | Who supports the vehicle, fabrication and third-party equipment after delivery? | Separate warranty terms, service contacts, handover documents and response process. |
Compact and easy to position, but payload, headroom, service access and equipment layout can be restrictive. Confirm the base vehicle’s remaining capacity before committing.
Can offer more workspace and flexibility, but adds towing, setup and storage considerations. A fixed kiosk may simplify power access while reducing mobility.
Share this project with participating builders Check trailer weight distribution
Listings and matches are regional research options, not endorsements. Verify trade licences, insurance, references, past builds and contractual terms directly before paying a deposit.
Example manufacturer data showing how voltage, wattage, dimensions and weight change by group configuration.
Background on hygienic design, material safety, performance and certification marks used by regulators.